INDEPENDENT BUILDING REFERRALS • AUSTRALIA-WIDEStart with the right conversation, not a sales pitch.
BUILDING KNOW-HOW

Granny Flat Planning Checklist.

Secondary dwellings may offer flexible living, but site eligibility and total cost must be checked locally.

A successful building project usually starts with a careful brief and realistic expectations. Use the steps below as general planning guidance; exact legal and technical requirements vary by state, council and project.

STEP 01

Confirm land and approval rules

Check site size, zoning, setbacks, parking, drainage and other controls with the relevant planning authority. Do not assume one state’s rules apply nationally.

STEP 02

Include connections and access

Electricity, water, sewer, stormwater, access and landscaping can sit outside an advertised building package.

STEP 03

Clarify what turnkey means

A quote may or may not include design, permits, site preparation, appliances and final certification. Request an itemised schedule.

STEP 04

Think about long-term use

Consider privacy, accessibility, thermal comfort, maintenance and possible future occupancy before choosing a floor plan.

For project-specific advice, consult licensed building professionals and relevant government authorities. This guide is general information, not legal, financial, planning or engineering advice.

YOUR PROJECT STARTS HERE

Have a plan?
Let's hear it.

Tell us what you're thinking. One clear enquiry is the start of a more useful conversation.

Start your free enquiry